EV Utility | NAL

Get in touch

EV Utility

EV Utility

EV Utility is a universal EV charger foundation system that makes installations faster, lighter, and easier on-site.

The solution comprises a lightweight chamber system with a bespoke adaptor plate. This simple design supports multiple foundation configurations and OEMs with just one modular approach.

EV Utility makes installations flexible but repeatable across a range of EV infrastructure applications – L1, L2, and L3 alike. With its simple, universal design, the solution allows for a more standardised approach across EV infrastructure projects.

Implementation

Implementation

• EV Utility combines the lightweight STAKKAbox™ Utility access chamber with a bespoke steel adaptor plate that can be adapted to suit any charging hardware

• STAKKAbox™ Utility chambers are available in either 600x600mm or 450x450mm

• The solution creates a universal frame that can cover three sizes (L1, L2, L3)

• Each size supported can have one of two preferred cover configurations, for either central or offset cable entry

• Capacity to fit cables underneath, allowing for easy cable entry and pulling

• Can be installed at civils stage, prior to the delivery of charger units if required

Features and benefits

  • General

    • Enables faster, safer, and more cost-effective EV charger installations
    • Standardises foundation designs, for simpler specification and on-site delivery
    • Offers the flexibility and consistency to suit multiple site layouts and OEMs

  • Installation

    • Stackable chamber ring sections quickly achieve the desired depth
    • Integrated duct knockouts reduce drilling
    • Offers rapid, deskilled installations coupled with fast lead times

  • Safety

    • Lightweight, modular construction
    • All parts weigh less than 25kg for safe single-person lifts
    • Extensively tested and certified for safe EV infrastructure use

  • Sustainability

    • Chamber component uses modern materials achieving up to 100% recycled PP
    • Concrete-free solution – supporting reduced installation impact
    • Third-party EPD verified, with materials that are recyclable again at end of life

  • Cabling

    • Separates civils and cabling works
    • Open internal space for easy cable pulling and management
    • Compatible with 150mm ducting for efficient cable routing

  • Cost

    • No need for HIAB or additional plant to manoeuvre and install the product
    • Reduced system components – resulting in a more efficient supply chain
    • Lower overall project costs due to time, machinery, and efficiency gains

  • Future-proofing

    • Allows for simple upgrades as charger units evolve over time
    • Chemically resistant below-ground, with a life expectancy in excess of 40 years
    • Immediate reinstatements achievable, with no need for concrete surround

Sign up for exclusive news, events and announcements

Subscribe

For more information see our Privacy Policy.